WGU C215, OPERATIONS MANAGEM ENT

Study Guides Aug 18, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

WGU C215, OPERATIONS MANAGEM ENT

OA EXAM, WGU OA QUES TIONS, C215

LATEST EXAM, WGU C215 ANSWE RS,

OPERATIONS MANAGEMEN T TEST, WGU

BUSINESS EXAM

Question :

Total Quality Management (TQM) Philosophy

Correct Answer:

customer focus

continuous improvement

employee empowerment

use of quality tools

product design

process management

managing supplier quality

Question :

Process Capability Index (Cpk)

Correct Answer:

Basic function of Six Sigma. Measures the process potential and performance of processes. The higher the range of Cpk, the improved is the ability of the process to complete its necessities. Uses both the process variability and the process specifications to determine whether the process is "capable."

Question :

Six Sigma

Correct Answer:

A disciplined, data-driven approach and methodology for eliminating defects (driving toward six standard deviations between the mean and the nearest specification limit) in any process - from manufacturing to transactional and from product to service.

Question :

Design Capacity

Correct Answer:

The theoretical maximum output of a system in a given period under ideal conditions.

Question :

Effective Capacity

Correct Answer:

The capacity a firm expects to achieve given its current operating constraints.

Question :

Location Analysis

Correct Answer:

proximity to customers, transportation, source of labor, community attitude, proximity to suppliers, and many other factors.

Question :

Line Processes

Correct Answer:

A type of process used to produce a large volume of a standardized product.

Question :

Batch Processes

Correct Answer:

A type of process used to produce a small quantity of products in groups or batches based on customer orders or specifications.

Question :

Project Processes

Correct Answer:

A type of process used to make a one-at-a-time product exactly to customer specifications.

Question :

Continuous Processes

Correct Answer:

A type of process that operates continually to produce a high volume of a fully standardized product.

Question :

Bottleneck

Correct Answer:

Longest task in the process.

Question :

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 18, 2025
Description:

WGU C215, OPERATIONS MANAGEM ENT OA EXAM, WGU OA QUES TIONS, C215 LATEST EXAM, WGU C215 ANSWE RS, OPERATIONS MANAGEMEN T TEST, WGU BUSINESS EXAM Question : Total Quality Management (TQM) Philosophy...

Get this document $30.00