WGU C783 Project Management EXAM A Which element of the scope statement documents the process and criteria you'll use to determine whether deliverables are complete and satisfactory? - ANSWER-Success criteria, otherwise known as acceptance criteria.

Name the purpose of the scope management plan. - ANSWER-It documents the procedures for preparing the project scope statement, in other words, the WBS; defines how the deliverables will be verified; and describes the process for controlling scope change requests.

Name the four types of project endings. - ANSWER-Starvation, integration, extinction and addition.

This component of the scope statement documents the deliverables or items that will not be included in the project. - ANSWER-Exclusions

Before assembling the project team, what needs must the project manager assess first? - ANSWER-Skills required by team members.

  • / 4

Page 2 of 77

2 Name the two significant processes you'll perform within the human-resources planning process. - ANSWER-Organizational planning and staff acquisition

This process is where you'll choose team members or organizations who will work on the project. - ANSWER-Staff acquisition.

What are the triple constraints according to CompTIA? - ANSWER-Time, cost and quality

Name the major elements of a scope document. - ANSWER-product description, key deliverables, success and acceptance criteria, key performance indicators, exclusions, assumptions, and constraints.

Performing this function on key deliverables results in the WBS. - ANSWER-Decomposition

An activity that cannot start until its predecessor has concluded is said to have what type of logical relationship? - ANSWER-Finish-to-start

Name the estimating technique that bases estimates on past projects of similar size and scope.

  • ANSWER-Analogous estimating.

What is the first step in examining a scope deviation request? - ANSWER-Identify the cause. 2 / 4

Page 3 of 77

3

What is the most often used logical relationship? - ANSWER-Finish-to-start

Three point estimates use which three estimates to calculate the average estimate? - ANSWER- Most likely, pessimistic, and optimistic

Placing activities into a logical sequence and determining their dependencies is called what? - ANSWER-Activity sequencing

Describe float. - ANSWER-The difference in the length of time between the early start and late start or the early finish and late finish of an activity on the project.

What type of scheduling chart represents task duration on a timeline and typically displays dependencies? - ANSWER-Gantt

Name the two types of schedule formats used on most projects. - ANSWER-Gantt charts and milestone charts.Name the steps in validating a project. - ANSWER-Validate the business case, and then identify and analyze stakeholders.

  • / 4

Page 4 of 77

4 Name the 9 knowledge areas outlined in the PMBOK Guide. - ANSWER-Scope, time, cost, quality, human resources, communications, risk, procurement and integration management

Name the steps in validating a business case. - ANSWER-feasibility study, justification, and alignment to the strategic plan

In which project process group is the project charter document created? - ANSWER-Initiating

Name the project process group that begins when the project charter is approved - ANSWER- Planning

This system assures the project doesn't deviate from the planned requirements. - ANSWER- Change control system

Name the term that describes processes that are repeated. - ANSWER-Iterative

What type of requirement describes the elements required for a business process? - ANSWER- Business requirements

What should come first, the project scope or the project charter? - ANSWER-The project charter.

  • / 4

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: WGU EXAMS
Added: Aug 30, 2025
Description:

WGU C783 PROJECT MANAGEMENT EXAM LATEST 2024- 2025 COMPLETE 350 QUESTIONS AND DETAILED CORRECT ANSWERS ALREADY GRADED A+ WGU C783 Project Management EXAM A Which element of the scope statement docu...

Get this document $30.00