Who is responsible for the administration of their cognizant TAG-OUT log? - ANSWER-

EXAM ELABORATIONS Sep 4, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

3M (303)

Who is responsible for the administration of their cognizant TAG-OUT log? - ANSWER- Authorizing Officer

What program is used to generate information for maintenance data system (MDS)? -

ANSWER-OMMS-NG

What can go in the location block of an MRC? - ANSWER-See LGL, see EGL, location of equipment

Who is responsible for placing the work center in revise mode to ensure oversight? -

ANSWER-LCPO

In SKED in order to X or mark a check as complete, what mode must SKED be in? - ANSWER-Maintenance view

What is an AER and how often are they conducted? - ANSWER-Administrative Effectiveness Review. Quarterly

When entering a 2k in OMMS-NG, what minimum information is required? - ANSWER- All items with a red check by them

What does IEM stand for? - ANSWER-Inactive Equipment Maintenance

What can be used in SKED to verify what part of a MIP is carried by a fellow work center for split MIP and other purposes? - ANSWER-LOEP Manager

What must you bring when you are trying to order a DLR? - ANSWER-DLR(or RIP Chit), RPPO Log, 2K

An advanced change Notice is received when? - ANSWER-Whenever a change has been implemented to an existing maintenance requirement

Which document is used to provide shipboard maintenance managers with a consolidated listing of deferred maintenance to identify material condition of the ship? -

ANSWER-CSMP

Who is the designated person designed to mark the weekly PMS schedule to indicate that a PMS check has been completed? - ANSWER-Work center supervisor (WCS) 1 / 2

What is a SCAT code? - ANSWER-A code used to identify test equipment

The cent sign when displayed on the quarterly board indicated what about the MR? - ANSWER-MR was satisfied by a higher level test

When should equipment be placed in IEM status II? - ANSWER-Equipment is not going to be used for 7 days or more and is scheduled for overhaul, repair or removal from safe storage.

Which maintenance action prepares the equipment for periods of prolonged idleness and are usually performed only once at the beginning of the inactive period? - ANSWER-Lay-up maintenance

Which status of IEM can equipment leave the ship? - ANSWER-II

Who is responsible for ensuring the CSMP accurately describes the material condition of the work center? - ANSWER-Work Center Supervisor

Who must initial all line-out and changes on MIPS/MRC? - ANSWER-LCPO/Dept.

LCPO

When are caution tags to be used? - ANSWER-When temporary instructions exist indicate an unusual actions must be taken

Who may sign for completion of maintenance completion if the outside activity responsible is unavailable? - ANSWER-Ship maintenance + Material Officer

What is required when placing equipment in status II IEM? - ANSWER-Valid reason, JSN, Applicable LU check, Letter from Dept. Head

Who maintains 13 weeks of equipment validation? - ANSWER-3-MC

A check note entry must be made on the accountability sheet for what PMS checks? - ANSWER-Out of periodicity, Reschedule, re-schedule, not applicable, accomplished y higher authority

To perform an equipment validation you must first do what? - ANSWER-Verify perform an equipment item exists by opening the item in OMMS-NG

What is OPNAVINST 4790.8C? - ANSWER-Ship's Maintenance and Material Management manual (3M manual)

Which view on SKED allows the user to view line-outs on (MIPSs)? - ANSWER-PMS Documents

  • / 2

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Sep 4, 2025
Description:

3M Who is responsible for the administration of their cognizant TAG-OUT log? - ANSWER- Authorizing Officer What program is used to generate information for maintenance data system (MDS)? - ANSWER-O...

Get this document $30.00