Wisconsin, WI Lead Risk Assessor Exam

Question:

EPA and WI DHS Lead Based Paint Definition

Answer:

≥0.5%

≥1.0 mg/cm2

Question:

Nationally houses built before 1978_______ have lead based pain

Answer:

75%

Question:

XRF

Answer:

X-ray fluorescence

  • / 4

Question:

Factors that should be considered for XRF:

Answer:

  • Substrate Correction
  • inconclusive range
  • measuring K & L shell reading

Question:

What year was lead based paint banned?

Answer:

1978

Question:

Only _______ areas that are in the scope of work from the contractor

Answer:

testing areas

Question:

Sampling requirements for Inside a home

Answer:

Visual inspection Less than 4 rooms = sampling all rooms More than 4 rooms = minimum of four rooms sampled

Each room should have sampled: Floor Alternate between the tough and

window sill 2 / 4

Question:

_______% confident for room amount with big complexes, with lots of rooms

Answer:

95%

Question:

Wait how long after any cleanup has been done

Answer:

an hour

Question:

Sampling requirements for outside a home

Answer:

-Have to do a visual inspection.-Doesn't specify dust wipe sampling outside -No requirements to have porch floor dust wiped - HUD requires it for particular projects so it is expected to be done -Soil Samples

  • / 4

Question:

Sampling requirements for soil samples (and max levels)

Answer:

3-10 composite samples in drip line 400 ppm is the threshold for children areas 1200 ppm for all other areas

Question:

HUD paint chip recommended size

Answer:

Recommended HUD paint chip size is 2" X 2"

Question:

What type of investigations can Lead risk assessor do?

Answer:

  • clearances
  • full inspection
  • lead partial inspection
  • lead-free inspections
  • EBL
  • Hazard Screening
  • Lead-safe Investigations

  • / 4

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Aug 28, 2025
Description:

Wisconsin, WI Lead Risk Assessor Exam Question: EPA and WI DHS Lead Based Paint Definition Answer: ≥0.5% ≥1.0 mg/cm2 Question: Nationally houses built before 1978_______ have lead based pain An...

Get this document $30.00