In wet areas, what are the requirements for wall finishes?

Correct answer: walls within 2' of service sinks, toilets, or

urinals are required to be constructed of moisture resistant material (cement board, X) and are required to have tile (or similar) finish up to minimum 4' AFF. Wallcovering may be used above 4' AFF. Lavatories do not count as a service sink.

Are outlets required on every wall?

Correct answer: Residential yes, Commercial no

What is the minimum clear floor space in front of a lavatory?

Correct answer: 30" x 48" with about 17" of that clear under the

lavatory

What is the minimum clear floor space in front of a bathtub?

Correct answer: 30" x 48"

What is the minimum clear floor space in front of a urinal?

  • | Page

Correct answer: 30" x 48"

What is the minimum clear floor space in front of a shower?

Correct answer: 30" x 48"

All front approach (barrier free) counters must have a clear knee

space of at least:

Correct answer: 30" W x 17"D

All front approach (barrier free) counters must have a clear floor

space of:

Correct answer: 30" W x 48"D with about 17" of the 48"

underneath the counter

(t/f) The dip of the overflow shall not be considered in determining knee and toe clearances.

Correct answer: true, you don't count the overflow drain

For the PRAC, this chair is in the way of a credenza. Where do I put the marker(s)?

  • | Page

Correct answer: On BOTH the chair AND the credenza, they are

in the way of each other.

What are the CLEARANCES required at an accessible toilet/water closet?

Correct answer: a 60" turnaround anywhere in the space, have

60" clear at the toilet's rear wall, and 56" clear along the side wall.

When taking PRAC, are clearances and dimensions the same?

Correct answer: NO - clearances are the dashed shaped boxes

and dimensions are the linear strings

When taking PRAC, can you put more than one room label per room when asked to label spaces per program?

Correct answer: NO, one label per room. just because you can fit

  • workstations in an open office, doesn't mean you put the "open
  • office" label in the room twice.

Which walls are subject to the most glare and heat issues?

Correct answer: South

  • | Page

Where should emergency lighting be located?

Correct answer: Aisles, corridors, and exit access stairways and

ramps.

Where should audio/visual fire alarms be located?

Correct answer: Restrooms, hallways, lobbies, and general

assembly areas & visible from any location in the room. This means that sometimes 2 are required if the space is a hallway with a turn. They are mounted between 6'-8" to 7'-6" AFF.

What do supply diffusers look like in an RCP?

Correct answer: They typically have an X through them

What do return diffusers typically look like in an RCP?

Correct answer: They typically have a diagonal line through

them.

What residential walls need to be framed as plumbing walls?

Download Study Material

Buy This Study Material

$30.00
Buy Now
  • Immediate download after payment
  • Available in the pdf format
  • 100% satisfaction guarantee

Study Material Information

Category: Construction and Industry
Description:

NCIDQ PRACTICUM EXAM LATEST ACTUAL QUESTIONS AND CORRECT VERIFIED ANSWERS|ALREADY GRADED A+|GUARANTEED TO PASS CONCEPTS In wet areas, what are the requirements for wall finishes? Correct answer: wa...

Purchase PDF $30.00