NCTI 2020 Progression Maintenance Tech I II

CAREER EXAMS
Loading...

Loading study material viewer...

Page 0 of 0

Document Text

NCTI 2020 Progression: Maintenance Tech I - II

Conventional Questions And Answers

  • / 3

NCTI 2020 Progression: Maintenance Tech I - II Conventional Questions

And Answers

  • According to SCTE- and NCTA-recommended trunk system map symbols,
  • fiber-optic cable is represented by: Double arrows within a small circle on a solid line.

2. The forward path signal in a traditional tree-and-branch architecture: Orig-

inates at the headend and is transmitted downstream through coaxial trunk cable and trunk amplifiers.

3. In an HFC network,: Processing equipment in the headend converts the forward

RF signal to a light signal.

  • During aerial plant construction,: The strand is tensioned so its sag profile
  • matches that of the overhead utility power lines.

5. With underground plant construction,: The fiber-optic and coaxial cables are

often placed underground with other utility lines to jointly share construction costs.

6. Standby power supplies: Continue providing an output voltage even during a

utility power outage by using a backup power source.

  • Centralized power configurations: Provide the advantage of increased reliabil-
  • ity through sharing of expensive backup generators and sophisticated monitoring equipment among different power realms.

8. When transmitting broadband signals: In a two-way hybrid fiber/coax (HFC)

network, two or more individual optical fibers are required for each optical node location.

  • RF trunk amplifiers: Have attenuator pads, equalizers, and diplex filters that
  • control and route the RF signals.

10. Verifying plant reliability includes: Frequency response sweeping, which is

  • / 3

NCTI 2020 Progression: Maintenance Tech I - II Conventional Questions

And Answers

adjusting RF amplifier circuits to amplify all frequencies in the bandpass spectrum as equally as possible

  • Which of the following is a requirement in the process for measuring

leakage using a dipole antenna, as required by the FCC?: The antenna must

be placed 3 meters from the system components and 3 meters from the ground.

12. Many cable companies require which type of leaks to be fixed?: All types

of leaks must be fixed.

  • According to the FCC, the leakage log should contain which of the follow-

ing?: The probable cause of the leakage.

  • Which of the following FCC required information must a cable system
  • keep on file for two years?: Annual CLI calculations, regular (quarterly) monitoring programs, and a list of all channels used in the aeronautical bands.

  • If your leakage detector indicates there is a leak and displays a reading
  • of 14 microvolts per meter (uV/m) when you are 80 feet from a possible leak

source, what is the approximate calculated level of the leak from 10 feet?: 112

uV/m.

  • / 3

NCTI 2020 Progression: Maintenance Tech I - II Conventional Questions

And Answers

  • If a large signal leak is found in the aerial plant, what is a good first step in

locating the leak?: Drive around until an absolute peak is found.

  • Which of the following best describes demand maintenance procedures

with regard to signal leakage?: The demand maintenance procedures can im-

prove the CLI measurement results by identifying and correcting the largest leaks first.

  • When troubleshooting signal leakage in the drop system, what is indicated
  • if all signs of signal leakage disappear when the ground block is disconnected

and terminated on the side connected to the customer premises?: The back-

ward route from the ground block to the tap can be eliminated as a source of The backward route from the ground block to the tap can be eliminated as source of leakage.

  • Which typical over-the-air signal sources can cause a false alarm with a
  • signal leakage detector?: Typical sources include aircraft communication signals and ham, mobile, and government radio broadcasts.

  • When adjusting or selecting the elements of a dipole antenna for measur-
  • ing signal leakage, what is the approximate length of each element relative to

the wavelength of the signal being measured?: One-quarter wavelength.

21. Which of the following problem(s) are caused by egress?: Interference with

aeronautical navigation and communication, amateur radio, public service, and cellular communications.

  • What cumulative leakage index (CLI) meets Federal Communications Com-

mission (FCC) requirements?: 64 or less.

  • What is the maximum allowable signal detectable in the airspace during a

flyover?: 10 µv/m.

Download Study Material

Buy This Study Material

$30.00
Buy Now
  • Immediate download after payment
  • Available in the pdf format
  • 100% satisfaction guarantee

Study Material Information

Category: CAREER EXAMS
Description:

NCTI 2020 Progression: Maintenance Tech I - II Conventional Questions And Answers NCTI 2020 Progression: Maintenance Tech I - II Conventional Questions And Answers 1. According to SCTE- and NCTA-re...

Purchase PDF $30.00